Our process

Eight steps from idea to keys-in-hand.

A calm, feasibility-first process with one point of contact, clear deliverables at every stage and no surprises at City Hall.

1

Discovery call

A free 30-minute conversation about your goals, property, and budget. We confirm whether an ADU makes sense before you proceed.

What you do
Share your goals, property basics and any constraints.
Typical duration
30 minutes
Deliverables
Goals summary & next-step recommendation
2

Property feasibility review

We assess zoning, lot dimensions, servicing capacity, setbacks and conservation authority jurisdiction to confirm what's buildable on your specific lot.

What you do
Provide property details and any surveys or documents you have.
Typical duration
1–2 weeks
Deliverables
Feasibility read & preliminary options
3

Concept design & budget envelope

We translate the feasibility findings into a concept design and an honest budget range, so you can make a confident go / no-go decision.

What you do
Review concepts and confirm direction.
Typical duration
2–4 weeks
Deliverables
Concept design & budget envelope
4

Detailed design & engineering

Concepts become permit-ready drawings with structural, mechanical, and energy details, engineered to the Ontario Building Code.

What you do
Approve the detailed design and finishes.
Typical duration
4–8 weeks
Deliverables
Stamped drawings & specifications
5

Municipal permits & approvals

We prepare and manage the building permit application and any required approvals, responding to municipal comments on your behalf.

What you do
Sign permit documents where required.
Typical duration
6–16 weeks (city-dependent)
Deliverables
Issued building permit
6

Construction

Your suite is built by an independent licensed builder under its own contract with you, and we manage the schedule and communication throughout: site prep, servicing, structure, envelope, systems and finishes. Regular updates and one point of contact throughout.

What you do
Approve milestone selections; enjoy the updates.
Typical duration
8–24 weeks (by type)
Deliverables
A built, code-compliant suite
7

Inspections & occupancy

We coordinate municipal inspections through to final occupancy, ensuring the suite is legal and ready to live in or rent.

What you do
Walk the suite with us at completion.
Typical duration
Within construction window
Deliverables
Occupancy & deficiency sign-off
8

Handover, warranty & tenant-ready package

Your builder hands over keys and warranty documents (Tarion new-home warranty on detached suites, the contractor's written workmanship warranty on renovations), and we check the package is complete. Optionally, we prepare the suite to be listing-quality and rent-ready.

What you do
Receive keys, documents and warranty.
Typical duration
1 week
Deliverables
Keys, warranty & optional tenant-ready package

Total typical timeline: 6–14 months end-to-end.

Basement conversions are fastest; detached garden and laneway suites take longest. Municipal approval timelines vary by city and are the main variable.

Timelines are estimates. Actual duration depends on design complexity, municipal review and site conditions.